A vast industrial hall standing empty, lit by sunlight from high windows

Investors

India built the recycling plants. We're building what feeds them.

Optimite Energy is building the formal collection layer between India's end-of-life EV batteries and its registered recyclers, starting in Uttar Pradesh, the country's largest EV state.

The gap

The plants are ahead of the material.

Recyclers have built ahead of supply. The batteries exist, but most never reach a registered plant, because almost nobody collects them formally.

80+ kT

of announced lithium-ion recycling capacity in India, against about 15 kT of end-of-life batteries needing recycling in 2025

Source · NITI Aayog with TERI, January 2026 ↗

5.04 kT

of end-of-life lithium-ion batteries estimated to go through formal channels in 2025, against 18 kT collected informally

Source · NITI Aayog with TERI, January 2026 ↗

7.29 of 10.96

lakh tonnes: EPR certificates producers had procured against their target, all battery chemistries, as reported to Parliament in August 2025

Source · Ministry of Environment, Rajya Sabha reply, via PIB ↗

Why now

The obligations arrive as the packs do.

Electric vehicle registrations rose more than tenfold between FY20 and FY25. Two- and three-wheeler packs are assumed to last four to five years, so the vehicles registered since FY22 are reaching end of life just as producers' collection targets for them begin. The detail is in the amendments, 2023 to 2025.

Electric vehicles registered in India

Lakh vehicles registered per financial year, Vahan portal

Electric vehicles registered in India
FY201.74
FY211.43
FY224.59
FY2311.83
FY2416.81
FY2519.68
Government figures from the Vahan portal, which doesn't include Telangana. Source: Ministry of Heavy Industries, Lok Sabha reply (Vahan data), via PIB, March 2026 ↗

The regulatory clock

  1. Aug 2022

    Rules notified

    Extended Producer Responsibility on every battery placed on the market, EV packs included.

  2. Mar 2024

    A price on compliance

    EPR certificates priced between 30% and 100% of the environmental compensation for non-fulfilment.

  3. FY 2026-27

    EV collection targets begin

    For two- and three-wheeler EV batteries: a minimum of 70% of the quantity placed on the market in a base year.

  4. FY 2027-28

    Recycled content

    New EV batteries must contain 5% recycled material, rising to 15% by 2029-30.

Source: Battery Waste Management Rules, 2022 and amendments, via CPCB ↗
incentive scheme for critical mineral recycling, approved September 2025
₹1,500 crore
capital subsidy on plant and machinery under the scheme
20%
Source: Cabinet approves ₹1,500 crore incentive scheme for critical mineral recycling, via PIB, September 2025 ↗

Why this corridor

Starting in India's largest EV state.

Uttar Pradesh registered more electric vehicles than any other state over five years, and Delhi sits beside it: scooters, three-wheelers, cars and delivery fleets on the same roads. It's also the geography our team knows, and density is what makes route economics work in collection.

6,65,247

EVs registered in Uttar Pradesh, April 2019 to March 2024, the most of any state

Source · Ministry of Heavy Industries via PIB ↗

2,16,084

EVs registered in Delhi over the same five years, on the corridor's doorstep

Source · Ministry of Heavy Industries via PIB ↗

How we grow

Corridor by corridor.

Density first: one yard, routes that fill, then the next corridor. Collection economics are won on route density, not on reach.

Delhi NCRMuzaffarnagarMeerutBaghpatHapurGhaziabadGautam Buddha NagarBulandshahrYARD→ CPCB-registered recycler

The model

A simple trade, run with discipline.

  1. 01

    Buy

    End-of-life lithium-ion EV packs from EV makers, delivery fleets, swap networks, dealer groups and collection partners, at rates quoted upfront and paid the same day.

  2. 02

    Consolidate

    Every pack stickered and weighed, sorted by chemistry and condition, and sealed into documented lots.

  3. 03

    Sell

    Lots go to CPCB-registered recyclers at an agreed rate per kilogram.

The margin is the difference between what a battery is worth at the seller's door and what a sorted, documented lot is worth at a recycler's gate.

What compounds

The record is the asset.

Every pack carries its source, weight and custody history from pickup to gate. Recyclers buy on it, and it is exactly what producers need to evidence collection under the Battery Waste Management Rules.

That is a second line of business, built on the same records. We'll offer it once it can be delivered properly.

What's built

Built, not promised.

Before the first lot moves, the parts that are hardest to add later are already in place.

  • The custody system

    Operating software we build in-house runs pickups, packs, lots and payments: every pack stickered, weighed and photographed, in Hindi on the ground, and working offline when the signal drops.

  • The record

    One pack-level record from the seller's door to the recycler's weighbridge, in the form recyclers buy on and producers need for their returns.

    How it works
  • The company and the first yard

    Optimite Energy Private Limited, registered in Gurugram, Haryana. Our first yard is being built in Ghaziabad.

  • The leadership team

    We're hiring to lead operations, recycler and EPR partnerships, and compliance and safety.

    Open roles
Consignment recordIllustrative
Lot reference
LFP-2026-08-13
Chemistry
LFP · EV traction packs
Units
312
Pickups
4 · PK-20260811-02 +3
Vehicle
UP 15 ET 41••
Stickers
OE-000412 – OE-000723
Weight in
6,214.0 kg
Weight at gate
6,208.5 kg
Variance
−5.5 kg · −0.09%
Source
Hapur & Ghaziabad, UP
Destination
CPCB-registered recycler, Haryana
Custody
  1. 11 AUG · 09:42Collected: stickered, weighed
  2. 12 AUG · 17:05Yard in: scanned at the yard
  3. 14 AUG · 05:50Sealed: safety checklist
  4. 14 AUG · 06:20Dispatched: EWB 3412 5578 ••••
  5. 14 AUG · 13:58Gate in: recycler weighbridge
Sample record shown to illustrate the documentation we generate. Not live production data.

The team

Operators, not first-timers.

We come from Optimite, where we have built and run the operating systems behind a services business since 2019.

Building Optimite
Since 2019
Retention work by Optimite
500+ brands
Optimite’s offices
Gurugram & Dubai
Source · The Optimite story ↗
  • Nishant Yadav

    Nishant Yadav

    Co-founder

    Nishant co-founded Optimite in 2019 and has led its systems and execution since: the processes, records and operating software the business runs on. At Optimite Energy he brings that discipline to collection, so every pack is priced before pickup, recorded at every handover and accounted for at the gate.

    LinkedIn
  • Sushant Yadav

    Sushant Yadav

    Co-founder

    Sushant co-founded Optimite in 2019 and drives its strategy and growth, building the client and partner relationships behind the business. At Optimite Energy he leads the same work with recyclers, producers and investors, and keeps the company moving with clarity and pace.

    LinkedIn

We're raising our first round.

Our first yard in Ghaziabad is already being built. The round takes the model further: more routes, more yards along the corridor, and the team to run them. We'd rather commit to a number we can hit than a number that sounds good.